01
No capital investment
Get product made without a machine purchase, a capex approval cycle, or the floor space to house a line.
Est. 1969/Call and you'll reach an engineer, not a switchboard.
Production capacity without capital investment
Reliant runs laminating work on its own equipment, so you can put a product into production without buying a machine first.

Why contract
Not every programme justifies a capital purchase on day one. Contract laminating lets you prove a material, serve a contract, or cover a capacity gap using Reliant's own equipment and the engineers who built it — then move to your own line when the volume is there.
01
Get product made without a machine purchase, a capex approval cycle, or the floor space to house a line.
02
Validate that a material combination laminates the way you need it to before committing to a specification and a purchase.
03
Bridge a demand spike, a machine outage, or the lead time between ordering a line and commissioning it.
04
The people running the job are the people who design the machinery. What is learned in contract work carries straight into your line specification.
Scope
Capacity, minimum quantities, and turnaround depend on the material and the job. Send the details and Reliant will confirm whether contract work fits — and what it would take to bring the process in-house later.
Request a quote
Share the materials, the volume, and when you need it. Reliant will confirm whether contract work fits — and what it would take to bring the process in-house later.
Call and you'll reach an engineer, not a switchboard. Direct UK and US lines, answered in business hours.